We will do construction works, electrical installation, support walls, asphalt works and road signalization.
At this section of the road, we will rehabilitate, additionally build or newly build several support walls and passages of larger dimensions, namely 15 support walls in the total length of 1,298 m, and 10 support walls in the total length of 717 m. On this path there are several smaller buildings that need to be demolished. We will construct two pairs of bus stations with public lighting and two bridging elements of the passage of larger dimensions across the torrential ravines. Finally, we will replace the upper road structure and asphalt the entire section. We will also arrange the vertical and horizontal signaling.
Deadline for completion of work: September 2019
Value of performed works: €7.5 million