Works that include the construction and partial reconstruction of the gravitational collector, pressure pipelines and pump stations will be performed in the region of Sisaško-Moslovaška in Croatia. Drainage system will include a reconstruction and completion of a drainage system collector for the city of Petrinja in total length of 16 km and completion of a sewage network in total length 64 km and construction of 14 new pump stations, retention pools and a central system. The reconstruction of the pipeline system Petrinja will include the reconstruction of the main pipeline and the water supply network in the total length of 58 km.
Deadline for completion of work: End of 2019
Contractual value: €35 million